A concrete block foundation wall that is adequately braced should be cured for a minimum of how much time before backfilling?

Study for the Commercial Contractor Exam. Access hundreds of practice questions and comprehensive explanations to boost your confidence and ensure you're ready for the test!

Curing a concrete block foundation wall is an essential process that involves maintaining adequate moisture and temperature for the concrete to achieve its intended strength and durability. The general guideline for curing times can vary based on the type of construction work, the environmental conditions, and the specific project requirements. For concrete block foundation walls, it is commonly recommended that the curing period be at least 48 hours prior to backfilling.

This duration allows the concrete to gain sufficient early strength, ensuring that it can withstand the pressure of backfilling without risking damage or deformation. While 24 hours may allow for some initial set, it is typically not enough for the concrete to reach adequate strength, particularly for load-bearing applications like foundation walls. Curing beyond this time frame, such as 3 or 7 days, is beneficial for improving the overall longevity and resistance of the concrete but is not the minimum required curing time before backfilling. Thus, 48 hours is the minimum and widely accepted time frame to ensure the foundation wall has adequate strength before continuing with construction activities.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy